Structural steel is unforgiving. Gaps show, distortion compounds, and the job never happens in a vacuum. You are hanging brackets off a loading dock doorframe while a forklift keeps crossing your hose, or splicing a beam in a windy yard as heavy equipment idles nearby. That is the reality of on site welding services for industrial clients. In those conditions, MIG often wins. It is fast, repeatable, and forgiving of the variables that come with a portable welder working off a truck. Get the setup right and you can turn chaotic days into clean, certified structural repairs.
This guide walks through practical MIG choices for structural steel when mobility matters. It leans on field lessons from mobile welder crews who work out of trailers and service trucks, not textbook lab welds with perfect fixtures.
MIG, or Gas Metal Arc Welding, shines when the schedule is tight and the joint count is high. Structural steel jobs reward process speed more than perfect bead aesthetics. When you are installing railings on a mezzanine or stitching stiffener plates in a conveyor tower, arc-on time adds up. With correct wire selection and parameters, MIG gives high deposition, good penetration, and predictable profile in all the common positions.
Arc stability matters in the field. Shielding gas gets pushed around at a windy fence line, but with flux-cored gas-shielded or self-shielded wire you can still produce structural welds that pass bend tests. The process switches between spray and short circuit modes as needed. On thick base metal, spray transfer with sufficient voltage and argon mix gives deep fusion with low spatter. In tighter locations or root passes near flammable coatings, short circuit provides control at lower heat input. This flexibility is valuable when a mobile welder handles everything from pipe repair on a loading dock to reinforcing a column base.

Another quiet benefit is cleanup. Industrial sites punish grinders. Grind dust on food-grade stainless surfaces, flammable paint flakes near a gate operator, or sparks in a warehouse full of pallets, none of that helps anyone. MIG, tuned right, produces manageable spatter and slag, and in many cases less post-weld dressing than stick.
MIG is not a magic fix. It is sensitive to surface conditions, especially in short circuit. Structural steel arrives with mill scale, pre-primed shop coats, or greasy fingerprints from riggers. That contamination steals wetting action and can trap porosity. On high-strength joints, trapped hydrogen or microcracks hide under pretty beads. So prep matters more than process.
Wind and weather also test shielding. A classic mistake is running bare wire with C25 on an open pad in the afternoon breeze. You might get lucky on fillets in the flat position, then fail ultrasonic testing later. If the day demands wind tolerance, switch to a flux-cored product designed for structural work. The arc carries its own protection better than straight MIG, and you can dial in parameters that penetrate through mill scale.
Power availability constrains you too. Trailer generators that are undersized make spray transfer sputter. Duty cycle limitations on compact machines cause downtime just when the crane is on the clock. Choosing the right welder for the truck and the right feeder for long leads has an outsized impact on productivity.
A smart truck welding setup keeps the operation smooth when conditions are not. The goal is simple: steady arc quality, dependable power, and enough flexibility to switch from gates to girders without a trip back to the shop.
Power comes first. An engine-driven welder generator rated for continuous output in the 10 to 12 kW range covers dual roles: arc power and auxiliary tools. For MIG on structural steel, a constant voltage mode with solid low-RPM performance helps, because job sites love to stall generators with idle kicks. Add a wire feeder compatible with long gun cables, ideally with a remote voltage control so the welder can fine-tune from the work.
Guns and cables take a beating in portable applications. A 300 to 400 amp gun with a robust liner and interchangeable necks survives the heat of spray transfer on thick plate as well as the contortions of railing work. Keep spare contact tips, diffusers, and a couple of neck angles in the trailer. Nothing wastes more time than running a single gun through every task and fighting reach or heat.
Wire management is underrated. If you intend to swap between solid wire and flux-cored through the day, dedicate two feeders or two guns. Contamination from wire changeovers shows up in porosity and erratic feeding. A mobile welder who can clip in a self-shielded gun for fence welding outside the building, then return to a gas-shielded gun for indoor structural repairs, saves a lot of headache.
Shielding gas delivery on the truck needs a real plan. For spray transfer on structural steel, an 85 to 90 percent argon with 10 to 15 percent CO2 mix provides a stable spray with good penetration and minimal spatter. For short circuit, C25, 75 percent argon and 25 percent CO2, gives forgiving starts and wet out at lower voltage. Store cylinders safely, strap them for transport, and carry windscreens for critical joints when you are committed to gas-shielded welding outdoors.
Wire selection drives productivity and quality. Solid ER70S-6 remains a standard for structural steel, because the silicon and manganese deoxidizers help when mill scale or light rust remains. It favors clean prep and controlled shielding, and it produces beads that grind smooth for architectural elements like visible railings and gates.
Flux-cored options deserve equal attention. Gas-shielded flux-cored wires rated E71T-1 or E71T-9 provide excellent deposition and penetration in all positions, with slag that lifts cleanly. In breezy conditions around fence welding or crane yards, self-shielded E71T-8 or equivalent delivers welds that are less susceptible to wind. The tradeoff is slag cleanup and a slightly rougher bead appearance. On purely structural joints that will be painted or hidden, the speed and weather tolerance often more than offset extra cleanup time.
Stick still has a place. A certified AWS welder who switches to 7018 on a small root or a constrained vertical joint is not breaking faith with MIG, they are making a judgment call. Production welds on heavy equipment brackets or stiffeners in horizontal position favor MIG or flux-cored, while a pipe repair in a tight pit with water and dirt around may favor stick for a root pass and MIG for fill.
No site gives you the luxury of incremental adjustments for every joint. You need parameter windows that land in the zone quickly. For 3/16 to 3/8 inch structural steel with ER70S-6, a workable range for short circuit starts around 18 to 20 volts with 180 to 220 inches per minute of wire feed on 0.035 wire. Clean fit-up and a tight arc length help avoid lack of fusion.
Move up to spray transfer for 3/8 inch and thicker. On 0.045 solid wire with an 85/15 gas mix, voltage in the mid-20s and wire speeds in the 300 to 400 IPM range produce a smooth spray that wets out without stubbing. You will know you are in spray when the arc hisses with a steady tone and spatter falls to near zero. Keep travel speed consistent and push slightly, five to ten degrees, to control crown height and tie-in.
For gas-shielded flux-cored 0.045 wire on multipass structural fillets, voltage between 23 and 26 with wire feed around 200 to 260 IPM often lands you in the sweet spot. Watch the slag line. If slag traps at the toes, adjust technique before cranking heat. Slightly manipulate the gun to wash the puddle edges and pause at the toes on verticals.
Parameter cards help on a truck. Laminate a few proven setups for your machines and tape them inside the feeder door. Crews switch shifts, and a compact cheat sheet keeps quality consistent.
Fit-up makes or breaks structural MIG welds. Crews often start the day fighting warped parts because torch cuts were rushed yesterday. Gaps over 1/8 inch invite burn-through or cold lap, depending on how you react. Tack in sequence, back-step, and restrain where you can. The simplest clamp or strongback bar prevents hours of rework when a long angle starts walking off a column flange.
Surface prep is non-negotiable for critical joints. If you are welding over a shop primer, verify compatibility. Some primers are weldable and designed to burn through cleanly, others poison the puddle. Grind or needle scale back to bare metal at least one inch from the joint on both sides. For industrial railings and wrought iron fencing that spent a week outdoors, chase the rust before it chases your arc. A clean steel edge lets MIG penetrate and wet, rather than skitter across contamination.
Bevels matter on thicker sections. A 30 to 37.5 degree bevel per side with a small root face sets the stage for consistent root fusion and manageable fill passes. When clients ask why you spent extra time on prep for a splice in a beam above a loading dock, explain that good bevels reduce heat input in the long run because you do not fight to bury defects under more metal.
Stationary shops lean on fixtures. On site, you improvise. A balanced welding sequence is your best tool against distortion. Alternate sides of a joint, stagger welds, and place opposing tack welds to hold alignment. Heat wants to pull, so give it an equal pull on the other side.
When installing long railings or stainless steel handrails, run shorter welds and skip around to prevent a slow arc from humping the rail. Stainless behaves differently; it moves more with heat and holds heat longer, so TIG or pulsed MIG on stainless steel welding may serve better for visible, thin materials. For heavy aluminum gates or equipment guards, consider aluminum welding with a spool gun to reduce push distance and manage feeding. You can carry one MIG power source on the truck and support steel, stainless, and aluminum with the right guns and gas, but parameters and technique must shift with the alloy.
If straightness or a tight gap is critical, cool strategically. A wet rag near a weld toe can lock in distortion you do not want, so use cooling to your advantage only after the weld length is set. For structural members, enforce interpass temperature limits when required by procedure. Above 300 to 400 degrees Fahrenheit on certain steels, toughness drops and hydrogen cracking risk changes. A small infrared thermometer in the trailer pays for itself the first time you avoid a cold crack in a stiff joint.
Inspections do not care that you were welding in a dust storm. Quality has to be visible. Build visual standards into the crew’s routine. Consistent bead width, proper toe blending, no undercut beyond project limits, and a crown that is proportionate to the fillet leg length, these are visible and teachable.
Porosity is the number one field defect for MIG. If you see peppered pores in the bead or pinholes on grind, stop and correct the source. Check gas flow, usually 25 to 35 CFH for gas-shielded work in mild conditions, higher only if needed and not so high that you cause turbulence. Look for leaks in hoses or a clogged diffuser. Confirm that wind is not stealing shielding, especially when welding near open bay doors or outdoors on fences.
For certified work, align your welders, wire, and procedures with AWS provisions. Even if the client does not require full procedure qualification records, treat critical structural repairs with the same discipline. A simple weld log for each day, recording process, wire, gas, and parameters used, helps when questions arise later. If a weld will see ultrasonic or magnetic particle testing, grind starts and stops smooth, remove arc strikes, and avoid crevices where indications hide.
Mobile welding layers hazards. A portable welder working from a truck deals with traffic, pedestrians, and unknown electrical systems. Grounding to a greasy column base does not cut it. Clean a ground location down to bright metal and clamp firmly. Long leads create voltage drop, and poor ground connections make it worse, which in turn makes the arc unstable and invites defects.
Fire watch is not optional when you are welding in a warehouse full of cardboard or on a wooden dock. Keep charged extinguishers within arm’s reach and establish a post-weld watch period, 30 minutes is a reasonable standard. The small embers from MIG spatter find crevices in pallet racks and gate operator housings.
Fumes change with coatings. Galvanized gates and fencing produce zinc fumes that sicken healthy workers. Strip coatings where possible and ventilate. If ventilation cannot be controlled in a confined area, step back and switch to a safer plan. Deadlines do not justify a trip to the clinic.
Mobile crews that thrive never marry a single process. MIG covers 70 to 80 percent of structural steel tasks by quantity, but the remaining fraction benefits from TIG, stick, or specialized tools.
TIG, with foot pedal control and a clean arc, earns its keep on stainless components on food-grade equipment or visible railings where a brushed finish sells the job. The deposition is slower, but cleanup is minimal, and heat input is precise. For grab rails near a loading dock door where clients rest their hands every day, TIG beads look right and last.
Stick fills a gap in adverse conditions. If a storm blows in and you still need to land a critical tack deep in a joint, 7018, stored dry, becomes the closer. Its slag protects the puddle and its toughness is proven. After the root is sound, you can switch back to MIG or flux-cored to fill and cap quickly.
On pipe welding and pipe repair, many crews run a stick root, TIG where code demands it, then fill with flux-cored or MIG. It is not about loyalty to a process, it is about results. Clients remember whether the pipe line came back online, not which stinger you used.
A day on the road throws mixed work at you. The following snapshots show how MIG parameters and decisions shift across typical calls.
A forklift clipped a loading dock bumper bracket. The bracket is 3/8 inch steel, fillet welds cracked on both sides. Grind the fracture surfaces back to clean, grind a slight bevel to expose sound metal, and set up gas-shielded flux-cored 0.045 wire. With voltage around 24 and wire feed near 230 IPM, run multipass fillets, pausing at toes to avoid undercut. Shielding gas at 30 CFH with a windscreen if the dock is breezy. Tack in four corners to hold alignment before the first full pass. Cool between passes to keep interpass temperature reasonable.
A set of wrought iron fencing panels needs field splices to navigate a slope. Material is thinner, often 1/8 inch or less, with decorative profiles. Pull back from spray transfer. Short circuit on 0.030 solid wire with C25 keeps heat input down. Aim for 17 to 18 volts and moderate wire feed, watching for burn-through. Stitch weld, skip around, then grind and blend for paint. If panels are galvanized, strip the coating at least an inch back from the joint and wear proper respiratory protection.
A cracked gusset on a telehandler boom comes in late afternoon. This is not a cosmetic repair. Clean to bare metal, stop-drill crack ends, and verify with dye penetrant if available. Many boom steels demand controlled procedures and may not be suitable for field MIG without engineering approval. If the equipment owner authorizes a temporary repair to move equipment, document clearly and explain the limits. In cases like this, the correct call is often to remove the part for shop repair or replace entirely.
A stainless railing near a loading dock is missing a section. MIG with a tri-mix gas and 0.030 stainless wire can work, but TIG will produce cleaner results with less heat tint. If you must MIG, use pulsed settings if your machine supports it, to control heat and spatter. Protect adjacent surfaces with tape and blankets. After welding, passivate with an appropriate gel to restore corrosion resistance.
A heavy equipment trailer needs a new tie-down point welded to the frame. Trailer steels vary. Do not weld directly to heat-treated axles or to the flange of a beam that carries primary load without understanding the implications. Position attachments on the web or in reinforced zones. Use flux-cored or spray MIG for full fusion, and size fillets based on anticipated load, not visual guesswork. If unsure, calculate. A 3/8 fillet per side on a tab may carry several tons when properly executed, but geometry matters more than raw throat size.
Clients buy confidence when they call an emergency welder to a site at 2 a.m. They want certainty that the on site welding services they chose will stand up. Carry proof of qualifications. An AWS D1.1 structural certification for fillet and groove welds gives you credibility. Maintain WPSs and PQRs for the processes you run most, even if a job is not formally inspected. When a facility manager asks whether your welds meet structural standards, you should be able to reference the code, the wire classification, and the parameters used.
Photograph critical joints before, during, and after welding. Note heat input ranges, interpass control steps, and any deviations due to site conditions. This record protects both parties. If a weld is later modified by another contractor, your documentation shows the original quality.
Mobile efficiency in structural MIG comes from a hundred small choices. Stock the truck with fitted consumables, spare liners, and a second gun. Verify that the generator can power both welding and a grinder without starving the arc. Pre-stage gas mixes that match expected work: C25 and 85/15 cover most carbon steel needs, a tri-mix or straight argon for TIG on stainless or aluminum. Keep a dedicated spool gun for aluminum welding, because pushing soft wire through long liners in the field is asking for birdnests.
Train the crew to read puddles, not just meters. Parameters get you close, but the puddle tells the truth. If fusion lines do not wet to the toes, slow down and adjust angle. If undercut shows on verticals, pause longer at the sides and reduce voltage slightly. If the bead sits tall, increase travel speed or trim wire feed. The more fluent the team is at translating puddle behavior into changes, the less time is lost to rework.

Finally, keep relationships with suppliers tight. When a job grows and you need a pallet of E71T-1 overnight, a vendor who knows your operation saves days. That speed is part of being a mobile welder in the industrial world. You are a small shop on wheels, and your efficiency is the difference between a satisfied plant manager and a call that goes to the next truck.
Mobile work rarely follows the script. A morning structural repair might morph into afternoon fence welding and an evening call for a pipe repair. Keep your kit modular. One feeder set for solid wire and gas, another for flux-cored, a TIG rig for stainless or thin aluminum, and a spool gun ready for bigger aluminum sections. That flexibility turns downtime into billable hours.
On pipe welding, if the line is low pressure and carbon steel, a short circuit MIG root can work with tight fit and controlled heat, then fill with flux-cored for speed. If the pipe is high integrity, stick or TIG roots remain the standard, followed by flux-cored fill. Know your limits and your code requirements. A quick repair that fails costs more than a careful plan that takes another hour.
MIG delivers mobile efficiency because it combines speed with adaptability. On structural steel, it becomes even more powerful when paired with thoughtful prep, wire choices that fit the weather and position, and a truck outfitted for quick changeovers. Blend MIG with TIG for stainless and aluminum work, keep stick ready for awkward or critical roots, and stay disciplined about quality. That is how a portable welder becomes the first call when a gate sags, a beam needs stitching, or heavy equipment must get back on the job.
If you build a practice around those habits, your beads speak for you. Plant managers remember the day you kept a loading dock open during a holiday rush. Fence contractors remember the clean, straight runs you delivered in gusty conditions. And the next time someone searches for a certified mobile welder who can handle structural repair, railings, gates, and the inevitable emergency, your name sits at the top of the list for good reason.
On Call Mobile Welding